I called RecTec today to inquire about ordering a 590 for a built in kitchen I have in the works. Turns out that I will need to separate the controls from the pellet hopper and relocate them w/ certain spacing requirements. Has anyone done this or seen pictures of one that has been done? Thanks for your help. Really wanting to get this ordered but only if I can figure out how it will work.